Cameron Highlands, Pahang, Malaysia
2016
The Ulu Jelai hydropower plant is estimated to generate average 374 GWh of electricity per annum. For the construction of the dam, a wide range of Sika concrete admixtures, anchoring, grouting and waterproofing solutions was applied.